Free seasonal maintenance capacity planner
Free from Relay, no signup. Defaults and sources checked November 14, 2026.
Check whether your remaining crew time can cover the maintenance visits still owed this season. Separate completed visits from future bookings, allow for different visit lengths and crew sizes, and export an internal plan. Free, saved on your device, no account required.
Loading this device's saved copy…
Backup and restore
Download a backup or restore one here. Keep portable copies of work you need.
Assumptions and calculation
Visits owed = agreements × visits due each this season − completed visits. Booked visits still consume capacity. Group hours = visits owed × (on-site + travel minutes per worker) × workers ÷ 60, rounded up to 0.01 person-hour per group. Gross capacity = technicians × weeks remaining × weekly hours, rounded down to 0.01 person-hour. Deduct time off/training, other work and reserve once. Review each season separately; annual entitlements do not define when visits are due.
Inputs stay on this device. This plan does not read memberships, place appointments or contact customers.
Check maintenance plan pricing · Review a callback reserve · Document completed work
Start with the visits due in this window
Group agreements that have the same seasonal entitlement and visit duration. Enter how many visits each agreement owes during this window, how many have been completed, and how many uncompleted visits are already booked. A booked visit still consumes time until it is completed. Count each visit in one group.
Annual entitlement does not determine the seasonal split. For a two-visit annual agreement with only one visit due this spring, enter one visit for the spring window. Separate agreements with different start dates, covered equipment or service requirements. Review actual terms before entering a seasonal entitlement.
Compare workload with the remaining crew budget
- Visits still owed = agreements × visits due per agreement this season − completed visits.
- Visits still to book = visits still owed − uncompleted visits already booked.
- Group workload = visits owed × (on-site minutes + travel minutes per worker) × workers ÷ 60.
- Available person-hours = technicians × work weeks remaining × weekly hours per technician − time off/training − other work − reserve.
- Time gap = available person-hours − total remaining maintenance workload.
Group workload rounds up to 0.01 person-hour per group; gross crew time rounds down to 0.01. Extra weekly time rounds a shortfall divided by weeks remaining up to 0.01 person-hour. Zero remaining weeks leave that weekly rate undefined. Blank inputs stay unrecorded. A group with no visits owed needs no duration entry.
Weekly hours are before the separate deductions. Do not deduct these maintenance visits or their travel as “other work” as well. Two people working a two-hour visit consume four person-hours before travel. Negative crew budgets remain visible; no shortage is clamped to zero.
Worked example: 158 visits left and a 48-hour shortage
One fictional group has 100 agreements with two visits due each this season and 50 completed: 150 remain. Thirty of those are already booked, leaving 120 to book. Each visit needs 90 on-site minutes and 30 travel minutes from one worker, so the remaining workload is 300 person-hours.
A second group has ten agreements with one visit due each and two completed. Its eight remaining visits take two workers 120 on-site minutes and 30 travel minutes each, adding 40 person-hours. Four are already booked. Together the groups owe 158 visits, need 340 person-hours and have 124 visits still to book.
Two technicians × six weeks × 32 hours give 384 gross person-hours. Subtract 16 for time off/training, 60 for other work and 16 of reserve: 292 remain. The season is 48 person-hours short. That calls for at least eight additional person-hours per week across the team, or a reviewed change to the work due in this window.
Turn the plan into completed work
This is a manual scenario, not a synchronized membership ledger or an appointment schedule. Review qualifications, individual shifts, routes and promised windows separately. A season can fit in total and still have an overloaded week. Recheck each seasonal window as work is completed.
Use the maintenance booking guide to plan invitations after reviewing capacity, the maintenance pricing calculator to check the cost of visits, and the service report builder to document work actually performed. Local drafts and portable backups let you revisit the scenario without signup; nothing is sent to a customer.
Questions
Do booked visits reduce the workload still owed?
No. Only completed visits reduce the remaining workload. Booked but uncompleted visits are a subset of visits owed. They reduce the number still to book, not the hours still needed.
Should I enter annual visits or seasonal visits?
Enter only the entitlement due during the selected seasonal window. If an annual agreement includes two visits but only one is due this spring, enter one. Separate groups with different obligations or service durations.
Does this read my Relay maintenance plans or reserve appointments?
No. You enter a standalone planning scenario. It does not read memberships, change entitlements, reserve technician time, schedule appointments or contact customers.
Can I save the plan and export without signing up?
Yes. It saves in this browser when storage is available. You can download a portable backup, restore with confirmation and export an internal PDF. Keep a backup before changing devices or replacing a scenario.