Free furnace maintenance checklist
Free from Relay, no signup. Sources checked November 16, 2026.
A heating-season record for residential furnaces. Identify the fuel first, then retain the gas/propane or electric checks that apply. Oil equipment needs its own burner service procedure.
For qualified HVAC professionals. Use the equipment manual for test methods and acceptable readings.
What to record
Equipment and air delivery
- Record furnace identity, fuel, customer concern and the service instructions used
- Record filter condition and service; inspect accessible blower and air path
- Record supply/return temperatures, temperature rise and airflow test conditions
Gas or propane equipment
- Document accessible heat-exchanger inspection, method and areas not inspected
- Record burner, ignition and flame-sensing observations and service completed
- Document fuel-connection and gas-pressure checks using the qualified service procedure
- Record combustion-air and vent inspection, including termination condition
- Record combustion and carbon monoxide test results, units and sampling locations
- Document condensate handling on condensing equipment
Electric heat and controls
- For electric furnaces, document element, sequencer and staged-heat checks under the model procedure
- Record electrical condition and measured voltage/current against equipment ratings
- Document limit and other safety-control tests without bypassing protective devices
- Record thermostat demand, startup, heating operation and shutdown
Disposition
- Record any restriction on operation and the action communicated for a safety concern
- Separate work completed, untested items and required follow-up
Measurements and test conditions
Record actual values, units, equipment identity and test conditions. Add the specified limit and its manual or design reference in the measurement note.
- Supply and return temperatures and rise (°F or °C); compare with the nameplate
- Static pressure (in. w.c. or Pa), test locations and blower setting
- Voltage (V) and blower/heat-stage current (A), identifying each load
- For fuel-fired equipment: gas pressure, combustion readings and CO with explicit units, method and sampling point
Plan the scope
Schedule the heating visit before peak winter demand. Keep gas, propane, electric and oil scopes distinct. A visual inspection of accessible surfaces alone does not establish that the entire heat exchanger is sound.
A field documentation example
For an electric furnace, mark gas piping, combustion and vent items Not applicable with the fuel noted. For a gas furnace with an inaccessible exchanger section, describe that limit rather than recording a whole-exchanger pass.
References and adaptation
For qualified HVAC professionals. Adapt to the equipment manual, approved scope and applicable requirements. These are original documentation aids, not manufacturer procedures, ACCA forms or compliance certificates. Use equipment-specific limits; no universal passing values are supplied.
Questions
Can I print a blank checklist without creating a report?
Yes. Download blank checklist PDF gives you an uncompleted field worksheet with room for results, notes and readings. It requires no account or visit details.
Can I edit the checklist and export a customer report?
Yes. Open Record a visit to use the shared service report builder. New report uses this page's checklist. You can edit items, add notes, measurements and photos, and export from Preview after recording the visit date and at least one result or observation. Unanswered items stay Not recorded.
Does opening this page replace my saved reports?
No. Existing reports stay in the shared library on this browser. Choose New report to start this checklist. Download a backup to preserve your reports or move them to another device; this free tool does not sync with operational Relay jobs.
Does a completed checklist certify safety or code compliance?
No. It records the work and observations entered by its author. Equipment procedures, qualified testing and applicable requirements determine acceptance. No readings or passing limits are filled in automatically.