Free HVAC installation and commissioning checklist
Free from Relay, no signup. Sources checked November 16, 2026.
A residential installation record for air conditioners, air-source heat pumps and furnaces. Select the relevant branches and attach the equipment's actual startup procedure and design records.
For qualified HVAC professionals. Use the equipment manual for test methods and acceptable readings.
What to record
Design and equipment record
- Record approved scope, load/design documents and selected equipment match
- Record model/serial numbers, refrigerant and installation-manual revision
- Document mounting, service clearances, line routing and required electrical provisions
Refrigerant circuit where applicable
- Record nitrogen pressure-test value, duration and result under the model procedure
- Record evacuation and vacuum-decay readings with duration and isolation method
- Record line length, charge adjustments and charge-verification conditions
Air delivery, drainage and heat
- Document ducted airflow, external static pressure and test locations against design
- Record duct-leakage test result where required by the project
- Record drain operation and fitted condensate safety tests
- For fuel-fired heat, record fuel, venting and combustion/startup checks
- For electric heat, record stage operation and electrical readings
Controls and acceptance record
- Record thermostat configuration, operating modes and system-performance measurements
- For heat pumps, document reversing, defrost and backup/dual-fuel control verification
- Record tests deferred because of weather or access and who will complete them
- Document owner demonstration, manuals and warranty-registration handover
- List outstanding permit/inspection steps and unresolved work separately from startup results
Measurements and test conditions
Record actual values, units, equipment identity and test conditions. Add the specified limit and its manual or design reference in the measurement note.
- Pressure-test value/unit, duration and result; use the specified equipment procedure
- Final vacuum (microns) and decay value/time under the specified isolation test
- Charge verification and airflow/static readings with units and operating conditions
- Heating/cooling performance, electrical and fuel-specific startup readings as applicable
Plan the scope
Commissioning records compare actual results with design and manufacturer requirements. Startup alone is not commissioning. Keep the specified limits and their source with the readings; a deferred test remains outstanding after customer handover.
A field documentation example
When weather prevents charge verification, record installation work and tests completed without claiming final performance acceptance. Name the outstanding verification, its required conditions and the person responsible for the return visit.
References and adaptation
For qualified HVAC professionals. Adapt to the equipment manual, approved scope and applicable requirements. These are original documentation aids, not manufacturer procedures, ACCA forms or compliance certificates. Use equipment-specific limits; no universal passing values are supplied.
Questions
Can I print a blank checklist without creating a report?
Yes. Download blank checklist PDF gives you an uncompleted field worksheet with room for results, notes and readings. It requires no account or visit details.
Can I edit the checklist and export a customer report?
Yes. Open Record a visit to use the shared service report builder. New report uses this page's checklist. You can edit items, add notes, measurements and photos, and export from Preview after recording the visit date and at least one result or observation. Unanswered items stay Not recorded.
Does opening this page replace my saved reports?
No. Existing reports stay in the shared library on this browser. Choose New report to start this checklist. Download a backup to preserve your reports or move them to another device; this free tool does not sync with operational Relay jobs.
Does a completed checklist certify safety or code compliance?
No. It records the work and observations entered by its author. Equipment procedures, qualified testing and applicable requirements determine acceptance. No readings or passing limits are filled in automatically.